News
29 December 2020

From December 30, the length of the paid sections on M-4 Don will increase by 14 kilometers

The reconstructed section of M-4 Don Highway from the 211st to the 225th kilometer will become a toll road.

From December 30, 2020, when traveling from the 211st to the 260th kilometers of M-4 on weekdays, except for Friday, weekends, holidays and days before holidays, the owner of a vehicle will pay 95 rubles in the daytime from 07:00 a.m. until 00:00 a.m. At night (from 00:00 a.m. until 07:00 a.m.) the travel costs will be 65 rubles.

For other types of vehicles, including trucks, depending on the size and number of axes, the travel costs will be higher. Tariffs for this highway section for the owners of such vehicles will depend on the category of vehicle, time of day, and day of the week. For the owners of T-pass transponders, the discounts in the amount of 15 percent of the established fee shall apply, regardless of the time of day and type of vehicle. We also remind you that the members of the loyalty program can receive an additional discount from 3% to 15%.

The reconstruction of 11 kilometers of M-4 Don Highway made it possible to eliminate the so-called “Tula roller-coaster”, which is habitual for drivers, as a result, road users received another section of a modern high-speed highway, along which they can drive quickly, comfortably, and safely — a lighted road of the first category with two transport interchanges and five artificial structures meeting modern loads with intersections at different levels. It is important that an increase in the length of the toll section will lead to a reduction in the time spent by the users of this section of the road.